pending |
Dispute between CMR and TCRC concerning the discharge of J.R. for failing to meet the standards to work in a safety critical position nor had he demonstrated a commitment to follow through on the recommendations outlined to obtain his fitness for work. (COUNSEL) |
Dispute between CNR and TCRC-CTY-W concerning a Preliminary Objection for multiple disputes regarding the application of Articles 102, 103 and 43 of Agreement 4.3 and actions contrary to the Arbitrator’s decision in CROA&DR 4115. (COUNSEL) |
|
pending |
Dispute between CNR and TCRC-CTY-W concerning the discharge of B. F. for conduct unbecoming of an employee of CN further to posts made by himself on the Saskatoon Star Phoenix newspaper website. (COUNSEL) |
WEDNESDAY, JUNE 14, 2017 / MERCREDI LE 14 JUIN, 2017 |
|
pending |
Dispute between CNR and TCRC-CTY-C concerning the operation of train L531 in Conductor-Only service out of the terminal of Port Robinson. (COUNSEL) |
Dispute between CNR and TCRC-CTY-C concerning Conductor B.M. who was ordered Belleville to Montreal on train Q106 on December 23, 2014, upon arrival at Montreal and after yarding his train Mr.M. was instructed to depart Taschereau Yard and take his locomotives to Southwark yard and couple onto train X321. (COUNSEL) |
|
Dispute between CNR and TCRC-CTY-C concerning Conductor A.A. who was required to switch cars on her train at the initial terminal of Montreal for the placement of the distributed power (locomotive) as per the Company’s instructions on December 6, 2014. (COUNSEL) |
|
THURSDAY, JUNE 15, 2017 / JEUDI LE
15 JUIN, 2017 |
|
Dispute between CPR and TCRC-CTY-E concerning the Company incorrectly calling crews out of Mactier to fill assignments in Sudbury. (COUNSEL) |
|
Dispute between CPR and TCRC-LE-W concerning the discharge of S. H. for failing to ensure train was being properly operated/handled in a non-main track between Ogden and Alyth resulting in a collision with a proceeding train causing derailment and damage to equipment. (COUNSEL) |
|
Dispute between CPR and TCRC-LE-W concerning the discharge of C. P. for leaving unsecured equipment in track DELK resulting in unintended movement of equipment and collision resulting in derailment. (COUNSEL) |
TUESDAY, JULY 11, 2017 / MARDI LE
11 JUILLET, 2017
|
|
4565
|
Litige entre CNR et USW-2004
concernant la suspension de 120 jours impose au prépose itinérant a
l’entretien M.C., « pour votre conduite inacceptable d’un employé
relativement à l’altercation aven M.B., y compris avoir proféré des menaces
envers cet employé et ne pas vous être conformé à la Politique du CN sur la
prévention de la violence en milieu de travail ». |
4566
|
Litige entre CNR et UNIFOR
concernant l’imposition de 15 mauvais points remis au dossier disciplinaire
de J.R.S. pour « ne pas avoir signalé à l’autorité compétente votre
présumé accident du 27 novembre 2013 tel que stipule par la
procédure » et son congédiement pour accumulation de mauvais points. |
4567
|
Dispute between CNR and TCRC-CTY-C concerning the abolishment of Traffic Coordinator Positions at Southwark Yard and assigning scheduled work to management personnel in the terminal of Montreal. (COUNSEL) |
4568
|
Litige entre QGR et TCRC-CTY-E concernant l’avis de changement technologique selon l’article 26 de la convention collective émis par la Compagnie selon lequel elle désire abolir tous les postes de chefs de triage. (COUNSEL) |
WEDNESDAY, JULY 12, 2017 /
MERCREDI LE 12 JUILLET, 2017
|
|
4569
|
Dispute between CNR and TCRC-CTY-W concerning the assessment of 20 demerits to Conductor D.C. of Winnipeg, for violations of the Company’s Attendance Management Standards. (COUNSEL) |
4570
|
Dispute between CNR and TCRC-CTY-W concerning the assessment of 20 demerits to Conductor D.C. of Winnipeg for violations of the Canadian Rail Operating Rules and Time Table Speed Restrictions for trains designated as Special Dangers Commodities. (COUNSEL) |
4571
|
Dispute between CNR and TCRC-CTY-W concerning the assessment of 3 heads of discipline for 15 demerits each (first head of discipline reduced to 10 demerits via Step 3 of the grievance procedure), and subsequent discharge for accumulation in excess of 60 demerits to Conductor D.C. of Winnipeg. (COUNSEL) |
4572
|
Dispute between CPR and TCRC-LE-W concerning the dismissal of Locomotive Engineer W.S. for his prior discipline record and the culminating incident of proceeding through a stop sign governing movement over the Petroleum Way crossing, resulting in the crossing warning system not being fully activated for at least 20 seconds and the crossing gates/barriers not being in a horizontal position prior to fouling the crossing. (COUNSEL) |
THURSDAY, JULY 13, 2017 / JEUDI LE
13 JUILLET, 2017
|
|
4573
|
Dispute between CPR and TCRC-CTY-W concerning Conductor L.M. and the Company’s failure to accommodate her family status. (COUNSEL) |
4574
pending
|
Dispute between CPR and TCRC-CTY-&-LE-E concerning a violation of the Collective Agreements, the CIRB certificate certifying the Union as the exclusive bargaining agent for all running trades employees, the NJ Agreement and historical practice as a result of the Company assigning bargaining unit work to non-bargaining unit employees/members on the Lacolle Subdivision. (COUNSEL) |
4575
pending
|
Dispute between CPR and TCRC-CTY-&-LE-E concerning a violation of the Collective Agreements, the CIRB certificate certifying the Union as the bargaining agent for all running trades employees, NJ Integration Agreement and 304 Pool Local Agreement and historical practice, by reassigning TCRC bargaining unit work to non-bargaining unit employees on the Lacolle Subdivision. (COUNSEL) |