WEDNESDAY, NOVEMBER 15, 2017 / MERCREDI LE 15 NOVEMBRE, 2017

4592

Dispute between CNR and TCRC-Division 105 concerning the discharge of B.D.S. for failure to complete a job brief in accordance with GOI 8.12.1, violation of CRO Rule 111, 104(j), General Rule A (xii) while working as Conductor on L57151-29 resulting in a head on collision at 20.8 MPH with train L57051-29 at Potter. (COUNSEL)

4593

Dispute between CNR and TCRC-LE-W concerning R.C. and the assessment of discharge for violation of CRO Rule 42 entering Foreman Sehra’s limits without authority while working as the LE on train A41251. (COUNSEL)

4594

Dispute between CPR and MWED concerning a claim for C.G. (COUNSEL) *Resolved After Hearing*

4595

Dispute between CPR and TCRC-CTY-W concerning C.M. for the following :

- 14 Day Suspension for being observed with safety glasses on top of his head, not on his eyes as required, walking beside cars while working as the Foreman on the PS11-01 Assignment.

- 21 Day Suspension for failing to wear his seatbelt while operating a company vehicle.

- Discharge for failure to have the correct TGBO in his possession while operating on train 100-08 from Brandon to Winnipeg and failure to report violation after becoming aware of it upon his arrival at Winnipeg.

- Discharge for failure to work in the most productive manner while working on train P21-12 through failure to put engine in conventional mode when qualified to do so resulting in a 15 minute delay to assignment. (COUNSEL)


THURSDAY, NOVEMBER 16, 2017 / JEUDI LE 16 NOVEMBRE, 2017

4596

Dispute between CPR and TCRC-CTY-E concerning B.G. and the assessment of discharge (reduced to a time served suspension of 98-days) for crossed drawbars which resulted in damage to CP 8716 and delay to train 235-08 and the failure to immediately report this accident/incident to RTC, Superintendent, Calgary Operations Centre in violation of GOI Section 11, Item 6 and the failure to be forthcoming with respect to the reason for the delay to train 235-08 when he reported such to the RTC. (COUNSEL)

4597

Dispute between CPR and TCRC-LE-W concerning B.R. who was withheld from service after receiving a prohibition order which not include the direction to not operate railway equipment. (COUNSEL)

4598

Dispute between CPR and TCRC-LE-W concerning C.M. and the assessment of discharge for failing to immediately report an injury he sustained, a violation of GOI Section 11, Item 6.0, Rule Book for Train and Engine Employees Section 2, 2.2(a) and T&E Safety Rule Book CORE Safety Rules, Item 1, Rights and Responsibilities. (COUNSEL)

 

 

TUESDAY, DECEMBER 12, 2017 / MARDI LE 12 DÉCEMBRE, 2017

4599

Dispute between CNR and TCRC-CTY-C concerning the preliminary objection of arbitrability for the file concerning J.S. and the alleged violation f Articles 11.7, 41, 56, 61, 67, 85 and 85.5. (COUNSEL)

4600

Dispute between CNR and TCRC-LE-C concerning the discharge for accumulation of demerits of M.K. following the assessment of 40 demerits for the CROR Rule 42 violation. (COUNSEL)

4601

Litige entre CANPAR et MUA-1976 concernent le refus de la réclamation de temps supplémentaire de G.C. pour ne pas avoir été appelé pour couvrir pendant ses vacances afin de faire du travail qui a été assigne a d`autres compagnies de transport.


WEDNESDAY, DECEMBER 13, 2017 / MERCREDI LE 13 DÉCEMBRE 2017

4602

Dispute between VIA and TCRC concerning the disqualification and subsequent discharge of Locomotive Engineer S.M. (COUNSEL)

4603

Dispute between CPR and TCRC-CTY-W concerning J.S. and the discipline of a 30 day suspension for violating various rules violations, and subsequent discharge for his prior discipline and culminating safety record and from failure to work safely by not riding the right end box car. (COUNSEL) 


THURSDAY, DECEMBER 14, 2017 / JEUDI LE 14 DÉCEMBRE 2017

4604

Dispute between CPR and TCRC-CTY-E concerning the discharge of A.S for failing the CR110 effectiveness test; resulting from not conducting a train parade inspection 142 and not complying his last chance agreement dated April 18, 2016. (COUNSEL)

4605

Dispute between CPR and TCRC-CTY-E concerning G.R. and the company`s failure to accommodate. (COUNSEL)